🏆
Delivered On Time
Completed in just 75 days, exactly as planned through structured project management and careful coordination.
👷
In-House Delivery
Over 95% of the refurbishment was completed directly by the Laci Construction team, ensuring complete quality control.
📈
Value Creation
Designed to maximise functionality, market appeal and long-term property value through thoughtful refurbishment.
🤝
Investor Ready
A proven example of delivering refurbishment projects from planning through completion for homeowners and investment partners.
Project Overview

Complete Residential Refurbishment

A complete transformation of a three-bedroom family home, delivered in just 75 days with a strong focus on quality, functionality and long-term value.

This project demonstrates how thoughtful planning, structural improvements and high-quality craftsmanship can unlock a property's full potential while creating lasting value for homeowners and investors alike.

📍
Location
Morden, South West London
🏡
Property
95m² Three-Bedroom Home
📅
Duration
75-Day Programme
🏗️
Scope
Complete Residential Refurbishment
🕒
Completed
November 2025

INVESTMENT POTENTIAL

Unlocking Hidden Value

This property had strong foundations but an outdated layout that limited both functionality and market appeal.

Our objective was to unlock its full potential through thoughtful planning, structural improvements and high-quality finishes—creating a modern family home while significantly increasing its long-term value.


PRE-CONSTRUCTION

Planning & Strategy

Before any construction work began, every aspect of the refurbishment was carefully planned.

The new kitchen layout required structural alterations; the electrical installation needed to be fully upgraded to meet current regulations; and the bathroom was redesigned to improve both functionality and space utilisation.

Every decision was made with the final result in mind rather than treating each room as an individual renovation. With a clear plan in place, construction could begin with confidence.


PROJECT EXECUTION

Bringing the Vision to Life

Construction began with the structural alterations that transformed the heart of the home.

The wall separating the kitchen and dining room was removed, allowing the space to become one open-plan living area supported by new structural steelwork. The rear opening was widened and complemented with a fixed glazed panel, creating stronger visual connections with the garden while introducing significantly more natural light.

At the same time, the property underwent a complete mechanical and electrical upgrade, including a full house rewire, new plumbing installations and modern lighting throughout key living spaces.

Internally, every surface was renewed with fresh plaster finishes, new flooring, bespoke joinery, replacement internal doors and carefully selected finishes designed to create a consistent and timeless interior.


Seventy-five days after work began, the transformation was complete.

What was once a series of disconnected rooms became a bright, modern family home with improved flow, upgraded services and bespoke details throughout. Every element was completed with a focus on quality, functionality and long-term durability.

With the exception of the entrance door installation and carpet fitting, all construction work was delivered directly by the Laci Construction team, allowing complete control over quality and project delivery from start to finish.

PROJECT OUTCOME

The Result


PROJECT TIMELINE

From Vision to Completion

Follow the complete 75-day refurbishment journey—from the first site survey and structural alterations through to the final handover.

Laci Timeline v4
01

Planning & Design

Week 1
  • Initial site survey and measurements
  • Design development and layout planning
  • Structural assessment
  • Material selection and procurement
02

Demolition & Structural Alterations

Week 2
  • Internal demolition works
  • Existing wall removal
  • Structural steel beam installation
  • Rear opening enlargement
03

First Fix Services

Weeks 3–4
  • Full house rewiring
  • New plumbing installation
  • New boiler installation
  • Car charging point installation
  • Full plastering
  • Bathroom tiling
  • Building regulations compliance
04

Interior Fit-Out

Weeks 5–7
  • Kitchen installation
  • Bathroom installation
  • Bespoke joinery
  • Internal doors
  • Staircase alterations
  • Shutter installation (internal windows)
  • Flooring installation
  • Full house painting
05

Finishing Works

Weeks 8–10
  • Second fix carpentry
  • Final electrical and plumbing fixtures
  • Decoration and finishing
  • Snagging and quality checks
06

Completion & Handover

Week 11 (Day 75)
  • Final inspection
  • Professional cleaning
  • Client handover
  • Project successfully completed

PROJECT SUMMARY

Complete Residential Refurbishment

A complete refurbishment delivered with precision, quality craftsmanship and efficient project management from planning through final handover.

🛠️

Our Work Included

Project Management
Plumbing
Structural Alterations
Bespoke Joinery
Kitchen Renovation
Flooring Installation
Bathroom Renovation
Full Plastering
Full House Rewiring
Full House Painting
Boiler Installation
Second Fix Carpentry
🏠
Full Project Delivery

From initial planning and structural alterations through to the final finishes, every stage of the refurbishment was delivered in-house with complete control over quality, programme and workmanship.


Every Home Has a Story.
Some are just waiting for their next chapter.

Thinking About Your Own Project?


Whether you're planning a residential refurbishment or looking for a reliable development partner, we'd be happy to discuss your project.